MENU

DP-2 “Zwerver II” – Massflow ops on IFA2!

The DP-2 “Zwerver II” conducted in October/November 2019 another scope of remedial works on IFA2 Interconnector.

On deck of the vessel, our charterer mobilized a serious massflow spread including a HAUV survey equipment spread.

Massflow was carried out and straight after this scope, HAUV survey was done in order to satisfy the client with quick burial results.

Need Offshore or Renewable energy support?Contact us
© Copyrights 2020 HvS Dredging Support BV All rights reserved.